Contact Us
News

How is AmericasMart Bridging the Gap?

Atlanta
Placeholder

Holder Construction is building a bridge over troubled water (or, at least over Spring Street) at AmericasMart. The GC is named as the project manager in proposed permits filed with the City of Atlanta to build a pedestrian bridge spanning over the street between AmericasMart buildings one and two.