Contact Us
Slideshow

How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    Last year, when international research and advisory firm Gartner Inc. merged with CEB in a $2.6B acquisition, the company decided to consolidate its four offices in the Chicagoland area. Gartner selected 74K SF at River North Point, managed by EQ Office. 

    To meet Gartner’s 14-week move-in deadline, project management firm Gleeds engaged BEAR Construction to manage the construction of Gartner’s new Chicago office. 

    1 of 6
    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    BEAR’s team was led by project executive Tim Kosogof and superintendent Tony Melone. To reach the client’s deadline, BEAR put in overtime. The general contractor also had to work with out-of-town architects and engineers to execute on the design plans. Thanks to a chain of open communication and consistent on-site visits from the design and engineering teams, BEAR was able to ensure the office was built to Gartner’s specifications.  

    2 of 6
    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    Other challenges the contractor had to overcome in a short time frame included light fixture procurement and the installation of specialized felt panels.

    3 of 6
    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    By relying on a strong design and construction team, Gartner was able to create a space that does more than offer views of the Chicago River. The company’s office at River North Point features HunterDouglas-designed ceilings at the main entrance, booth and lounge areas. Coupled with decorative fixtures, the ceilings use an artistic mix of felt panels and wood beams to create a warm ambiance and manage the acoustics across the open office floor plan.

    4 of 6
    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    Working with additional IT, security and audiovisual consultants, BEAR was able to collaborate on design and install and commission the space in the time frame needed.

    5 of 6
    How BEAR Construction Delivered A World-Class HQ On A 14-Week Deadline

    BEAR’s dedication paid off. Gartner moved in on June 4, and has been enjoying the space since. 

    This feature was produced in collaboration between Bisnow Branded Content and BEAR Construction. Bisnow news staff was not involved in the production of this content.

    Other Slideshows